Comprehensive sustainability upgrade and roof refurbishment delivered within a fully operational commercial facility, enhancing the building’s energy performance, resilience and long-term operational efficiency while maintaining uninterrupted facility operations throughout.
• Installation of over 10,000m² of insulation, cement board and IKO bitumen roofing systems across the existing roof areas
• Delivery of a significant renewable energy upgrade through the installation of 842 nr. photovoltaic (PV) panels
• Installation of a new free-standing roof guardrail and edge protection system across the entire roof area
• Phased decommissioning, relocation and recommissioning of critical roof-mounted plant equipment to facilitate works
• Relocation of air conditioning units to a newly constructed ground-level plant area
• Installation and commissioning of a new fuel storage tank serving the emergency generator
• Removal of 14 nr. existing roof lights and replacement of 2 nr. roof lights
• Diversion of the main gas pipeline around the building
• Installation of a new lightning protection system and associated internal making-good works
