Phased construction of 136 nr. detached and semi-detached houses adjacent an existing live hospital and local authority council offices in phased construction. All units were designed to include for a natural gas condensing boiler, 5 PhotoVoltaic panels on the roof and a direct controlled ventilation system with window mounted humidity-controlled vents.