'THE LISMORE', LONDON

The project consisted of a mixed use development comprising two retail units on the ground floor, 14 apartments on the upper floors and one townhouse. The residential units consisted of two and three bedroom apartments and also a standalone three bedroom townhouse.

The Lismore Development was constructed on the site of a former Young’s Public House ‘The Plough’ and comprises of ground floor A3/A4 uses including a new Young’s Pub and a retail unit over basement storage.

Prior to the Young’s Public House, a decommissioned underground bunker existed on the site and as such significant excavation and piling works were carried out prior to construction of the main building. Located on a busy street corner in Clapham Junction, the main structure consisted of a 200sqm basement under a four storey RC frame with a mixture of cavity brick/block external walls and rendered blockwork. The ground floor footprint filled the entire 900sqm site and at first floor level a central courtyard was constructed with the upper floor apartments surrounding it. The acoustic separation between the ground floor retail units and the apartments was an area with which close detail was adhered to resulting in an excellent acoustic barrier between the two zones.

The site was bounded on two sides with both local businesses and residents and an exceptional relationship was maintained with all stakeholders throughout the project. The site received the achievement of ‘Performance Beyond Compliance’ from the Considerate Constructors Scheme.

The construction team worked in tandem with Youngs Brewery fitout contractor towards the final stages of the project and ensure all works were carried out in a coordinated and safe manner.


back to projects

  • CLIENTLONCOR HOMES LTD.
  • VALUE£3.5M
  • PROJECT MANAGERTOTAL PROJECT INTEGRATION
  • QUANTITY SURVEYORTOTAL PROJECT INTEGRATION
  • ARCHITECTHARPER DOWNIE ARCHITECTS
  • STRUCTURAL ENGINEERPRYCE & MYERS
Featured Projects

“I cannot speak highly enough of CField’s performance. Works to complete a development left unfinished by others were carried out at high quality, on time and on budget. Would not hesitate to work with you again”

Brian Curtin - Hogan Associates, Architecture & Urban Design

“CField carried out their work in an extremely efficient and professional manner in order to meet the contract requirements of this project. We look forward to working with them again on future projects.”

Kieran Flynn - Hallmark

“We found CField an excellent Building Company to deal with. Their attention to the specification and implementation of the works made the job easy for us. This job was completed on budget and on time, and we would recommend CField to any client looking for a good job well done.”

Aidan Lucey - O’Callaghan Properties

"I have been working with KPMG for five years and for any type of project management and construction work, CField would always be first on my list to engage."

Ruairi Keneally - KPMG

“CField were a pleasure to deal with on site. Given that it was a live site and the administrative offices continued to function throughout the project period, disruption was minimised and management of movement of staff to different locations within the building during the project was facilitated efficiently. Any issues or concerns raised were dealt with positively in a timely manner and the project was completed without delays.”

Una Carroll - Assistant Principal Officer, Cork Education & Training Board

"Thank you for your excellent work in bringing this project to fruition. CField and all the excellent staff were always professional, committed, honest and worked hard to help us have the lovely building we now have. Their continual communication and patience in guiding us through the process was very much appreciated. I would recommend them, and have done, to anyone considering a similar build."

Dr Edward Gash - Principal, Midleton College

“Will happily continue to recommend CField to our clients. Excellent service.”

Joe Keane - Development Director, O’Callaghan Properties

“The finished building looks great and your team can be congratulated on a fine achievement. In anticipation of the reopening on Friday we have already taken the hanger off our ‘At Risk’ Register. We plan to identify your project as a major success over the past year at our Heritage at Risk National Launch.”

Robert Parkinson - National Planning & Conservation Architect